Rio de Janeiro Steel Terminal, Brazil

Project Type
Bulk Terminal
Client
Triunfo Operadoro Portuaria Ltda
Project Value
Not Available
Project Period
1998
Current Status
Completed

Services

  • Master Plan
  • Operational Review
Rio de Janeiro Steel Terminal, Brazil

Project Description

Our client was awarded a long-term contract for the operation of the Rio de Janeiro steel terminal. The facility operates from two sites and a master plan for the operations was required.

Cullen Grummitt & Roe advised on:

  • Storage arrangements for various steel product including coil, wire rod, plate and pipe.
  • The most appropriate machinery for use in handling operations.
  • Layout design of a quayside storage warehouse with an opening roof to allow direct loading of product from warehouse to ship.
  • Delivery arrangements for the site from road and rail.
  • Truck parking arrangements to maximise operational efficiency
  • Relocation of an oil ship loading manifold.


Cullen Grummitt & Roe visited the site and obtained the data necessary to carry out a berth occupancy analysis.  CGR prepared a report detailing proposed operational arrangements and future developments including an enclosed building for steel product storage.

Consulting Services Include:

  • Feasibility Studies
  • Port Master Planning
  • Concept Designs
  • Detailed Designs
  • Tender and Contract Document Preparation
  • Project Management
  • Contract Administration
  • Site Supervision
  • Condition Surveys

Website Design & Development By Web Preference