Piers 1 & 2, New Reefer Area, Buenos Aires, Argentina

Project Type
Container Terminal
Client
Terminales Rio de la Plata S.A
Project Value
USD 390,000
Project Period
2003 - 2004
Current Status
Completed

Services

  • Detailed Design
  • Site Supervision
  • Project Management

Project Description

As part of the redevelopment process of Piers 1 & 2, Cullen Grummitt & Roe has been commissioned to provide detailed design, site supervision and project management services for the construction of a new reefer area consisting of two new reefer blocks. The project included both civil and electrical works.

The works included demolition of existing pavements and concrete structures, earth movements, concrete works, steel works, stormwater conduits, electrical and communication pits, pavements and electrical and communication services.

The different types of pavement included concrete pavement, concrete and granite block pavement, asphalt pavement and temporary pavements to a total of 6,000 square meters.

The electrical works included the cabling and the installation of medium tension and low tension switchboards.

The works were carried out in two stages, in coordination with the Operations Management of Terminales Río de la Plata S. A.

Consulting Services Include:

  • Feasibility Studies
  • Port Master Planning
  • Concept Designs
  • Detailed Designs
  • Tender and Contract Document Preparation
  • Project Management
  • Contract Administration
  • Site Supervision
  • Condition Surveys

Website Design & Development By Web Preference