Pier 3 Quay Crane Cable Trench, Buenos Aires, Argentina

Project Type
Container Terminal
Client
Terminales Rio de la Plata S.A
Project Value
USD 0.26 million
Project Period
2005
Current Status
Completed

Services

  • Detailed Design
  • Site Supervision
  • Project Management
Pier 3 Quay Crane Cable Trench, Buenos Aires, Argentina

Project Description

Cullen Grummitt & Roe was commissioned by Terminales Río de la Plata S.A. for the Design, Project Management and Site Supervision for the reconstruction of the existing quay crane cable trench at Pier 3, including upgrading for further four cranes.

The project consisted in the demolition of an old concrete trench and its replacement by a double concrete trench, lined with a galvanized steel cover along 570 meters of wharf. As some 70 m length of the existing cable trench run over an existing inspection gallery of the quay wall, its reconstruction demanded the propping of the roof of this gallery and its partial demolition and reconstruction as well.

The works also included the enlarging and modification of two existing cable turning pit.

Consulting Services Include:

  • Feasibility Studies
  • Port Master Planning
  • Concept Designs
  • Detailed Designs
  • Tender and Contract Document Preparation
  • Project Management
  • Contract Administration
  • Site Supervision
  • Condition Surveys

Website Design & Development By Web Preference