Upgrade of Existing Ferry Terminals, Brisbane, Australia

Project Type
Marina
Client
Brisbane City Council
Project Value
AUD 0.2 million
Project Period
1999
Current Status
Completed

Services

  • Cost Estimate
  • Site Supervision

Project Description

The Brisbane City Council required maintenance and upgrading to meet stringent safety requirements at three ferry terminals on the Brisbane River. The steel pontoons at River Plaza and Merthyr Road were redesigned with safer deck layouts and streamlining structures were added to the ends to reduce suction eddies along the face of the pontoons. The existing pontoon at the Norman Park ferry terminal was replaced with a new pontoon to meet the safety requirements. Two terminals required new disabled access paths.

Cullen Grummitt & Roe was responsible for the design of the streamlining structures, layout of deck components, stability calculations, cost estimating and construction supervision of the three terminals.

Consulting Services Include:

  • Feasibility Studies
  • Port Master Planning
  • Concept Designs
  • Detailed Designs
  • Tender and Contract Document Preparation
  • Project Management
  • Contract Administration
  • Site Supervision
  • Condition Surveys