Berthing Dolphin Assessment, Cape Flattery, Australia

Project Type
Insurance
Client
GAB Robins
Project Value
Not Available
Project Period
2000
Current Status
Completed

Services

  • Expert Witness
  • Condition Survey
  • Insurance Assessments
Berthing Dolphin Assessment, Cape Flattery, Australia

Project Description

A berthing dolphin at a bulk silica sand loading facility was damaged by ship impact. CGR was commissioned to undertake an engineering investigation of the magnitude of the impact and implications of the damage.

The work carried out by Cullen Grummitt & Roe included a geometric and material non-linear analysis of the structure as well as back calculation of the accident berthing parameters. A review of maintenance documentation was also carried out in order to provide comment on contractual obligations.

Consulting Services Include:

  • Feasibility Studies
  • Port Master Planning
  • Concept Designs
  • Detailed Designs
  • Tender and Contract Document Preparation
  • Project Management
  • Contract Administration
  • Site Supervision
  • Condition Surveys