South Harbour, Port Master Plan, Manila

Project Type
Container Terminal
Client
Asian Terminals Incorporated (ATI)
Project Value
Not Available
Project Period
1995 - 1996
Current Status
Completed

Services

  • Master Plan
  • Cost Estimate
South Harbour, Port Master Plan, Manila

Project Description

Asian Terminals Incorporated (ATI) commissioned Cullen Grummitt & Roe to prepare a four-stage Master Plan for general cargo and containerised cargo for the South Harbour Terminal, Port of Manila.

The objective of the Port Master Plan was to establish a development framework for the South Harbour for the next ten years to ensure adequate provision of port facilities to meet the forecast cargo demand.

Cullen Grummitt & Roe analysed all projected trade data for general cargo and container traffic through the port. In conjunction with ATI and the Philippine Ports Authority, a master plan was prepared in four phases:

  • Phase 1 – Minimum term plan: 6 months
  • Phase 2 – Short term plan: 6 months – 2 years
  • Phase 3 – Medium term plan: 2-5 years
  • Phase 4 – Long term plan: 5-10 years


The Master Plan study included the consideration of berth occupancy rates, port operation practices, port facility productivity, navigation requirements and reclamation, internal and external port traffic, budget estimation and project programming.

Consulting Services Include:

  • Feasibility Studies
  • Port Master Planning
  • Concept Designs
  • Detailed Designs
  • Tender and Contract Document Preparation
  • Project Management
  • Contract Administration
  • Site Supervision
  • Condition Surveys