Refinery Product Wharf Upgrade, Port Dickson, Malaysia

Project Type
Petrochemical Terminal
Client
ESSO Malaysia Berhad
Project Value
Not Available
Project Period
1992 - 1994
Current Status
Completed

Services

  • Detailed Design
  • Site Supervision

Project Description

The project included the extensive rehabilitation and upgrading of the client’s Port Dickson refinery product wharf including:

Strengthening the wharf structure by incorporating new reinforced concrete beams and steel piles.

  • Rehabilitating and repairing the existing wharf structure.
  • Upgrading the fender system.
  • Provision of two new mooring dolphins accessed by 40m steel framed     walkways.
  • Provision for marine loading arms and fixed cranes.
  • Adding an extensive raised platform.
  • Replacing and upgrading wharf systems and piping.


The refinery remained operational during the project so disruptions to the product wharf operations and required down times had to be minimised.

The project was tendered on a lump-sum “design and construct” basis. A local contractor, in conjunction with Cullen Grummitt & Roe, successfully tendered for the work.  Cullen Grummitt & Roe provided structural and civil engineering input as follows:

  • Detailed design of the wharf structure rehabilitation, repair and strengthening work
  • Detailed design of new mooring dolphins, walkways, and new platforms and shelters added to the wharf.

Consulting Services Include:

  • Feasibility Studies
  • Port Master Planning
  • Concept Designs
  • Detailed Designs
  • Tender and Contract Document Preparation
  • Project Management
  • Contract Administration
  • Site Supervision
  • Condition Surveys