Mineral Sands Treatment Plant, Richards Bay, South Africa

Project Type
Bulk Terminal
Client
Union Corporation South Africa
Project Value
USD 10 million
Project Period
1975
Current Status
Completed

Services

  • Detailed Design
  • Site Supervision
Mineral Sands Treatment Plant, Richards Bay, South Africa

Project Description

A large pontoon was required to carry a mineral sand separation plant and a large steel industrial building required for separation of the mineral concentrate.

Cullen Grummitt & Roe was responsible for planning, design and supervision of the civil work and of the structure with detailed analyses of stability of the pontoon under various loads.  The initial work was done in Australia.  The major portion was done in Johannesburg, using our own key personnel plus locally recruited assistants.

Consulting Services Include:

  • Feasibility Studies
  • Port Master Planning
  • Concept Designs
  • Detailed Designs
  • Tender and Contract Document Preparation
  • Project Management
  • Contract Administration
  • Site Supervision
  • Condition Surveys

Website Design & Development By Web Preference