Brazil
- Port of Santos, Brazil
-
-
Our client investigated a number of sites in the port of Santos with a view to establishing a private container terminal. The most recent site involved the privatisation tender by the Government of the State of Sao Paulo in Brazil for the existing TECON container terminal.
- Rio de Janeiro Steel Terminal, Brazil
-
-
Our client was awarded a long-term contract for the operation of the Rio de Janeiro steel terminal. The facility operates from two sites and a master plan for the operations was required.
- Angra Dos Reis, Brazil
-
-
This project involved Cullen Grummitt & Roe carrying out a feasibility study for a new grain unloading berth at Angra Dos Reis, located between Sao Paulo and Rio de Janeiro in Brazil. The new berth was required to provide greater availability of the existing wharf for the loading and export of steel coil.
unloaders and conveyors, was prepared.
- Sepetiba, Brazil
-
-
Cullen Grummitt & Roe was comissioned to prepare a feasibility study into the practicality of transferring an existing mineral import facility for coal, coke, alumina and sulphur into a dual import / export facility to also allow the export of iron ore.