Argentina

Extension To Cold Store at Mercado Central, Argentina
Extension To Cold Store at Mercado Central, Argentina

This project involved a major expansion of an existing cold store facility in Buenos Aires.
The freezer rooms were constructed using an internal steel frame with insulated polystyrene sandwich panel cladding to provide column free spaces within each of the rooms.

Piers 1 & 2 Quay Wall Repairs, Buenos Aires, Argentina
Piers 1 & 2 Quay Wall Repairs, Buenos Aires, Argentina

As part of the privatisation of the Port of Buenos Aires in 1994, the consessionaire was required to investigate the stability of the quay walls that were constructed in the 1920’s. The Port Authority had concerns about the stability of the quay walls following the partial collapse of the wall on Pier 3

Piers 1 & 2, Buenos Aires, Argentina
Piers 1 & 2, Buenos Aires, Argentina

The Government of Argentina called tenders for the privatisation of the North Port of Buenos Aires. Cullen Grummitt & Roe, in conjunction with our client, was involved in the master planning, costing and staging of the development and the subsequent preparation of a tender for the concession of Piers 1 and 2. Our client was subsequently awarded the concession.

[Prev] 1 2 3  

Consulting Services Include:

  • Feasibility Studies
  • Port Master Planning
  • Concept Designs
  • Detailed Designs
  • Tender and Contract Document Preparation
  • Project Management
  • Contract Administration
  • Site Supervision
  • Condition Surveys

Website Design & Development By Web Preference