Ireland

Wharf Inspections, New Ross, Ireland
Wharf Inspections, New Ross, Ireland

As part of our ongoing work at New Ross, CGR was commissioned to provide an inspection and condition survey of two wharves. Both wharves are suspended concrete deck structures supporting rail mounted bulk unloaders.

Fender Upgrade, New Ross, Ireland
Fender Upgrade, New Ross, Ireland

The fendering system at Raheen Wharf at New Ross, Ireland was installed when the wharf was constructed over 25 years ago. These fenders have performed well during their life however damage had occurred to the units due to normal operational wear and tear.

Consulting Services Include:

  • Feasibility Studies
  • Port Master Planning
  • Concept Designs
  • Detailed Designs
  • Tender and Contract Document Preparation
  • Project Management
  • Contract Administration
  • Site Supervision
  • Condition Surveys

Website Design & Development By Web Preference