Queensland

Abattoir Extensions, Grantham, Australia
Abattoir Extensions, Grantham, Australia

To meet a significant increase in production at the Grantham plant, expansion of the hot beef chillers and boning room (1,200m2), staff entry (580m2), plate freezer complex (580m2) and hide fleshing facility (270m2) was required.

Investigation of Cold Store Operating Problems, Brisbane
Investigation of Cold Store Operating Problems, Brisbane

Changes in the operation of a group of chillers and freezers within a multi level building caused condensation on wall and floor surfaces in surrounding work spaces.
Cullen Grummitt & Roe carried out an inspection and prepared a report on the causes and the range of solutions to resolve the problems.

Food City Cold Store, Stage 1, Brisbane
Food City Cold Store, Stage 1, Brisbane

Stage 1 of the Food City Cold Store included a high-rise cold room, low-rise cold room (re-erected), refrigerated handling area and annex with palletising and blast freezing rooms. Also associated with the works was an amenities block, engine room and control room.

Murarrie Coldroom Extension (Stages 4 and 5), Brisbane
Murarrie Coldroom Extension (Stages 4 and 5), Brisbane

Stage 4 involved a new chiller extension and refurbishment of existing cold rooms at the Cold Storage complex at Murarrie was designed and documented.
Stage 5 involved the construction of a freezer room with an internal volume of 17,200m3, extensions to the battery charging area, a small maintenance workshop and external pavements.

Sheet Pile Wall Failure, Budd’s Beach, Australia
Sheet Pile Wall Failure, Budd’s Beach, Australia

There was a failure of a section of sheet pile wall which was installed at 40 Riverview Parade, Budd’s Beach on the Gold Coast. The sheet pile wall served as a cofferdam to allow the excavation and construction of the substructure of a proposed high rise residential apartment block.

Berthing Dolphin Assessment, Cape Flattery, Australia
Berthing Dolphin Assessment, Cape Flattery, Australia

A berthing dolphin at a bulk silica sand loading facility was damaged by ship impact. CGR was commissioned to undertake an engineering investigation of the magnitude of the impact and implications of the damage.

[Prev] 1 2 3 4 5 6 [Next]

Consulting Services Include:

  • Feasibility Studies
  • Port Master Planning
  • Concept Designs
  • Detailed Designs
  • Tender and Contract Document Preparation
  • Project Management
  • Contract Administration
  • Site Supervision
  • Condition Surveys

Website Design & Development By Web Preference