New South Wales

Molineaux Point, Botany Bay, Sydney
Molineaux Point, Botany Bay, Sydney

Cullen Grummitt & Roe prepared a layout plan and associated cost estimate to assist in a privatisation bid for land at Molineaux Point, Botany Bay, Sydney.

Pavements - White Bay, Sydney
Pavements - White Bay, Sydney

Sydney Port Corporation’s (SPC) facility at White Bay was originally constructed about 30 years ago. The facility was constructed on reclaimed land with a wharf consisting of caissons retaining the reclamation fill and supporting a front crane beam and a piled rear crane beam. The existing asphalt pavements were deteriorating to various extents and differential settlement of the asphalt and concrete pavements relative to the caissons and piled rear crane beam had detrimentally affected the stormwater discharge from the pavements leading to significant ponding of rainwater on the pavements. CGR was initially commissioned by Sydney Port Corporation to investigate and cost minimum cost schemes for rehabilitating the asphalt pavements for various terminal equipment and future life scenarios and for eliminating the ponding of rainwater.

[Prev] 1 2  

Consulting Services Include:

  • Feasibility Studies
  • Port Master Planning
  • Concept Designs
  • Detailed Designs
  • Tender and Contract Document Preparation
  • Project Management
  • Contract Administration
  • Site Supervision
  • Condition Surveys

Website Design & Development By Web Preference