Fiji

Taveuni Island Mooring Facility, Fiji
Taveuni Island Mooring Facility, Fiji

Shell’s oil discharge facility at Taveuni Island required upgrading to accommodate a new, 3,000 deadweight tonne oil tanker in near cyclonic strength sustained winds of 45 knots. The previous tankers used a Mediterranean-style mooring arrangement while discharging petroleum product. Discharge was via a floating hose approximately 100m offshore.

Vuda Point Terminal, Fiji
Vuda Point Terminal, Fiji

The existing 150NB back-loading pipeline at Shell’s terminal at Vuda Point had its mooring facilities collapse during a freak storm in 1998 and has not been used since then.

[Prev] 1 2  

Consulting Services Include:

  • Feasibility Studies
  • Port Master Planning
  • Concept Designs
  • Detailed Designs
  • Tender and Contract Document Preparation
  • Project Management
  • Contract Administration
  • Site Supervision
  • Condition Surveys

Website Design & Development By Web Preference